The system has been designed in a modular fashion to
accommodate expansion and change. In January of 1997 a cabling network was installed
throughout the structure. The initial study is concentrated in the southeast corner of a
small second floor room. In addition to the cable necessary to conduct the preliminary
study, cable was pulled through out the remainder of the structure so that new areas of
interest can be studied. Junction boxes are located at 10 key locations throughout the
structure. The locations were chosen in areas where there is some potential interest for a
detailed study in the future (i.e. garage door, dormer, chimney, etc.). These boxes will
allow additional instrumentation to be installed with little or no disturbance of the
finished structure.

Box containing electrical support system for all
instruments in the initial system.
|
|

Ends of cables pulled throughout
structure. These cables will allow the
system to be modified and/or
expanded as necessary. |