CE 560.320

Homework Assignments

2006

hw

1

2

 

 

3

 

4

5

EXAM 1

6

7

 

 

8

9

10

EXAM 2

PROJECT

 

due

M - 29 Jan

M - 5 Feb

 

 

M - 12 Feb

 

M - 19 Feb

M - 26 Feb

 

F - 9 Mar

T - 28 Mar

 

 

F - 6 Apr

F - 13 Apr

F - 13 Apr

 

TBD

assignment

hw1 images selected by the class

3.2.4(a) no block shear, 3.3.2(a) no block shear, 3.3.7(a) no block shear, 3.5-2 find the design tensile strength, check yield in the gross, frac in the net, and block shear

4.3-5 LRFD only, 4.3-10a, 4.6-2 LRFD only you do not need to check local buckling

cancelled

7.4.3a, 7.6.5a, 7.11.1a, and 7.11.4a

 

4.7-8, 4.7-12

5.2-3, 5.5-6(a)(b) also use eq. given in class for Lr, 5.5-15(a) calc. Cb based on factored loads, 5.10-4 - don't forget to also check shear for your selected beam (due Tues. 5pm)

6.6-1, 2001ex2#1

Cold-formed steel design: homework

 

 

 

 

04.09.2007

[prof. schafer] [civil engineering] [structural slides] [structural slides] [AISC] [AISI] [espn]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PREVIOUS YEARS

2006

hw

1

2

3

4

 

5

6

 

7

 

8

 

9

 

 

10

 

11

 

due

M - 6 Feb

M - 13 Feb

T - 21 Feb

T - 28 Feb

 

F - 3 Mar

F - 17 Mar

 

T - 4 April

 

T - 11 Apr

 

T - 18 Apr

 

 

F - 21 Apr

 

M - 15 May

assignment

hw1 (student selections)

3.2-3, 3.3-2a,b, 3.3-7, 3.4-5

3.5-5, 3.6-1, 4.3-1, 4.3-7

7.3-2, For 7.6-2 and 7.6-3 check all limit states (yield in gross, frac in net, ... not just shear and bearing)

7.11-1, 7.11-2

4.6-2, 4.5-2, 4.5-9, 4.5-11a,c,e you may want to use AISC Table 4-1& 4-2

5.2-2 add part (c) find My and compare to Mp

5.4-1, 5.5-3, 5.5-6 (Lr from class)

5.8-1, using any design aids: 5.10-1, 5.10-4, 5.11-2, 6.2-1, 6.3-1

6.6-3, 6.7-1, Group Problem: Find the design wind pressure for the San Martin Bridge structure. Instructions, San Martin bridge drawings page 1, page 2

Cold-formed steel design: homework

 

Final project description

 

 

2005

hw

1

2

3

4

 

5

 

  -------------

6

 

7

 

 

 

8

 

 

9

10

 

 

-------------

Project

 

due

M - 7 Feb

M - 14 Feb

T  - 22 Feb

M - 28 Feb

 

F - 4 Mar

W - 9 Mar

------------

M - 28 Mar

 

M - 4 Apr

 

 

 

M  - 11 Apr

 

 

M - 18 Apr

F - 22 Apr

W - 27 Apr

 

------------

TBA

assignment

hw1,

3.2-1, 3.3-2, 3.3-7, 3.4-1, 3.4-5

3.5-5, 3.6-1, 4.3-1, 4.3-7

7.3-2, For 7.6-2 and 7.6-3 check all limit states (yield in gross, frac in net, ... not just shear and bearing)

7.11-1Compactness only 4.3-1, 4.3-7

EXAM 1

------------------------------------------------------------------

4.5-3, 4.5-8, 4.5-10, 4.5-11a,c,e use AISC Table 4-1 & 4-2

 

5.2-2 add part (c) find My and compare to Mp

5.4-1, 5.5-3, 5.5-6 (Lr from class), 5.8-1,

using whatever design aids you choose: 5.10-1, 5.10-4

5.11-2,  6.6-3, 6.6-8, 6.8-1

in groups of 3 or less students, solve: 2001ex2#1 

 

8.2-5, 8.3-2, 8.3-5, Group problem: 8.6-2

cold-formed steel hw

EXAM 2

 

--------------------------------------------------------------------

closed on*

01.24.05

02.09.05

02.16.05

02.21.05

 

03.02.05

 

 

03.25.05

 

 

 

 

 

04.05.05

 

 

04.13.05

04.20.05

 

 

 

 

2004

hw

1

2

3

4

5

 

-------------

6

7

8

9

 

-------------

10

 

due

T - 3 Feb

M - 9 Feb

M - 16 Feb

M - 23 Feb

M - 1 Mar

W - 6 Mar

------------

W - 10 Mar

M - 29 Mar

T  - 6 Apr

M - 12 Apr

W - 14 Apr

------------

M - 26 Apr

assignment

hw1 - work in teams!

3.2-3, 3.3-2a,b, 3.3-7, 3.4-5 

3.5-5, 7.3-2, 7.6-2, 7.11-1, Sketch a connection 

7.11-10, 4.3-7, 4.5-3 

hw5  

EXAM 1

------------------------------------------------------------------

4.5-11(d) in-plane is strong axis bending 

5.4-2, 5.5-3, 5.5-6 (Lr from class), 5.10-4, 5.8-1, 5.11-2 

6.6-3, 6.6-9, 6.7-1, 2001ex2#1  

8.2-2, 8.2-11

EXAM 2 (in class)

--------------------------------------------------------------------

closed on*

01.28.04

02.04.04

02.11.04

02.17.04

02.23.04

 

 

03.07.04

03.22.04

03.31.04

04.07.04

2003

hw

1

2

3

4

-

____________

5

6

7

8

-

____________

9

-

 

due

W - 5 Feb

R - 13 Feb

W - 19 Feb

R - 27 Feb

W - 5 Mar

________

W - 19 Mar

W - 26 Mar

W - 02 Apr

F - 11 Apr

W - 16 Apr

______

M - 28 Apr

T - 6 May

 

assignment

hw1, notes

Segui 3.2-3, 3.3-2a,b, 3.4-5, 3.5-5 

delayed due to snow

hw4  
EXAM 1 

______________________________________________

4.3-7, 4.5-3 

4.5-8, 4.5-10, 4.5-11a,c,e use Table 4-1 & 4-2, 5.2-4 

5.5-3, 5.5-6 (Lr from class),  5.8-4, 5.10-4 

6.6-3, 6.6-9, 6.7-1, 2001ex2#1   

EXAM 2

__________________________________

in class assignment on cold-formed steel

FINAL PROJECT DUE (details

closed on*

02.03.03

02.10.03

02.19.03

02.24.03

 

 

03.18.03

03.25.03

04.01.03

04.09.03

 

__________

04.18.03