|    | 
	   | 
	   | 
 
 ![]()  | 
	 ![]()  | 
	 ![]()  | 
 
| Engineer / Architect: | N/A | 
|---|---|
| Location: | 
            Between Piers 4 and 5 Baltimore, MD  | 
          
| Year Built: | N/A | 
| Structural Form: | Cable-stayed Girder Bridge | 
| Historical Details: | N/A | 
| Technical Details: | The majority of the forces in this bridge seem to be carried by the steel girder underneath the deck. The cable-stayed portion seems to only stiffen the deck and provides no clear load path to either pier. | 
| Image Source(s): | Matt Sisinni | 
| References: | N/A | 




